Civil Works Package II - CONTRACT NO. KPCPL/CON/CW-II/2017-18/01 | |
The work to be performed involves Construction of Intake, Adit 1, Head Race Tunnel from Chainage 0.00m to 2700.00m ±100m. tunnel boring, mucking, lining , grouting and finishing as desired and stipulated in technical specifications and drawings complete in all respect including all labour, machineries, tool and plants with dumping of muck at designated areas upto a lead of +1.50Km, plugging of Adit with ‘Hinged Gate’ etc. | |
Closing Date: 11 Sept. 2018 14.30 Hrs | |
Status: Open | |
Civil Works Package III - CONTRACT NO. KPCPL/CON/CW-III/2017-18/02 | |
The work to be performed involves Construction of Adit 2, Head Race Tunnel from Chainage 2700.00m to 3900.00m ±100m., Surge Shaft, tunnel and shaft boring, mucking, lining, grouting and finishing as desired and stipulated in technical specifications and drawings complete in all respect including all labour, machineries, tool and plants with dumping of muck at designated areas upto a lead of +1.50Km, plugging of Adit as per codal provisions etc. | |
Closing Date: 11 Sept. 2018 14.30 Hrs | |
Status: Open |